Data quality and corrections

We publish every correction to our data, including what changed and how many records it touched. Corrections made before a customer saw the data are listed too.

How we classify capacity

Corrections

Entries for September were added to this record on September 27, 2026.

Con Edison, winter feeder values (September 2026)

What happened: Winter feeder values were not being read from the source field designated for winter capacity.

What changed: We corrected them using the designated field.

Records affected: 857 winter feeder values.

Central Hudson, substation values (September 14, 2026)

What changed: We corrected substation capacity values after removing duplicate feeder records and applying source values in their reported units.

Records affected: 54 substations (108 seasonal values).

Central Hudson, coverage (September 14, 2026)

What happened: Ten substations were no longer present in the source data.

What changed: We retired them. Their historical snapshots remain available.

Records affected: 10 substations.

Orange & Rockland, substation methodology (September 14, 2026)

What changed: We updated substation values to the published normal transformer rating minus observed seasonal peak load. These values suit rapid feasibility screening but do not account for Orange & Rockland's likely N-1 contingency margin. Final interconnection feasibility requires Orange & Rockland confirmation.

Records affected: 555 stored snapshot records are now classified as load-serving headroom. 97 earlier annual rows were replaced by seasonal rows.

United Illuminating, substation values (October 2, 2026)

What happened: Feeder-derived substation values were overstated because historical snapshots from renamed feeders were included.

What changed: Seven values were corrected downward by a combined 79.8799 MW.

Records affected: 7 substation values. Made before customer onboarding.

United Illuminating, coverage (October 2, 2026)

What happened: Stale circuits remained current after source naming changes.

What changed: We retired 31 feeder circuits and 4 substation circuits. Historical snapshots remain available.

Records affected: 35 circuits. Made before customer onboarding.

Known limits